Project Title: Cameron Court
Client: Owner
Location: Warrington, United Kingdom
Project Overview:
Phase 2 of the re-roofing project in Warrington involved a comprehensive survey to assess the condition of the existing roof and confirm that an overlay of the current waterproofing could be successfully applied.
Key works included:
• Installing thermal insulation to meet current building regulations
• Mechanically fastening a new single-ply membrane
• Fully encapsulating the building perimeter with the single-ply membrane
• Fitting new triple-skin polycarbonate rooflights
Thanks to exceptionally dry weather conditions, the project was completed two weeks ahead of the scheduled completion date.
Following a successful Electronic Leak Detection Test, a 20-year warranty was issued, and the project was officially handed over by Protan’s Technical Team.
We successfully delivered a full refurbishment of an existing flat roof to a commercial unit at Cameron Court Industrial Estate in Warrington. The project focused on upgrading the thermal performance, extending the service life of the roof, and ensuring compliance with current standards—while minimising disruption to the building occupier.
Cameron Court Industrial Estate is situated in Warrington, Cheshire—a thriving commercial and logistics hub in the North West of England. With excellent transport links via the M6, M62, and M56 motorways, Warrington has seen sustained growth in light industrial and warehousing developments, making reliable, thermally efficient building fabric a key requirement for local businesses.
The client required a refurbishment solution that would not only meet modern building regulation standards for thermal performance but also minimise operational disruption to the tenant.
The existing roof build-up comprised:
While the existing felt system had reached the end of its serviceable life, the underlying structure remained in suitable condition for refurbishment.
Before specifying a solution, we carried out extensive surveys to ensure our proposal would deliver the best long-term performance:
This rigorous approach ensured full compliance with technical requirements while reducing risk during installation.
To avoid stripping the existing roof—which would risk water ingress and disrupt the tenant’s operations—we specified an overlay system:
This approach upgraded the thermal performance of the roof to meet current Part L standards while offering robust, long-term waterproofing.
The project delivered:
By taking a careful, survey-led approach and selecting the right overlay system, we ensured a cost-effective, high-quality solution for our client at Cameron Court Industrial Estate.
Looking for expert flat roof refurbishment?
If you’d like to discuss a similar project or need advice on the right system for your building, get in touch via our contact page.
You can also visit our dedicated Protan page to learn more about the systems we install.
Please send CV and supporting documents to info@ddroofingltd.co.uk and we will contact you when we have demand for your specific skills